• Sonix Video Front
  • Sonix Video Back
  • Sonix Video Front
  • Sonix Video Back

Sonix Competition Video

0 reviews
0 out of 5

550,00 

Stitching Color *

Sonic Logo Color – Main *

Sonic Logo Color – Secondary

Select fit *

Wing Size *

Measuring *

Options

Gender *

Sizes *

To improve the speed of the flight, shoulders, arms, and front of the body up to the  knees are made out of Nylon (windproof fabrics that allows wind gliding). The fore-arms are made out of Lycra for more flexibility and to penetrate the Air. The lower front legs are made out of Cordura for more resistance and more response to their action. The collar is made out of Lycra. The back, body-side and crotch are made out of Lycra for more flexibility. This suit has reinforcements out of Cordura on the most vulnerable parts: the knees and the bottom.

Front and Upper arms in NYLON, Back and body side in LYCRA, Small part in POLY-COTTON on the upper back for the resistance, Fore arms in LYCRA with reinforcement in WINDSTOPPER on the elbow, Compétition Grips (double arms and legs) in Cordura, Different Inside Colour Grips, NEW A-BOOTIES (made in CORDURA 1000, preformed with sole reinforced, adjustable), Foam knees, All Front Legs and Bum in Cordura, Zipper windproof. Inside pocket. All stitching is double.

Wings in Nylon with a double plastic clip system attached and an adjustable cord to put the wings in tension. You can chose between “Small”, “Medium”, “Large” and “Extra Large” wings. Instead of the standard double plastic clip system you can order the Wichard RSL closing system as an extra.

* Embroidery digitizing is the process of converting existing artwork like a company logo or team emblem into a stitch file that an embroidery machine can sew on a garment. Before any design can be embroidered, it must be digitized.

How to measure yourself?

Take your measurements correctly

Please note that due to a variety of monitor settings, the color swatches may slightly vary from the actual fabric color. Thank you for your understanding.

Production timeline:
10 weeks*

*excluding shipping